Compact variable-dose system
For space-conscious installations where the application, airflow and extract arrangement support a compact configuration.
- Variable output control
- Compact installation route
- Fan proving and interlock options
Ozone equipment, controlled and documented
Reduce odour with the right equipment, interlocks and commissioning evidence defined before you commit.

Manufacturer-led project support
Context image, equipment configuration varies
MANUFACTURER-LED SUPPORT
PROJECT-SPECIFIC SIZING
COMMISSIONING & RECORDS
UK SUPPORT
Flagship application
Ozone is one stage in a complete extract strategy. We help define the generator, controls, pre-filtration, contact time and monitoring around the actual kitchen duty.
Plan a kitchen system ↗For space-conscious installations where the application, airflow and extract arrangement support a compact configuration.
For larger or more demanding duties requiring a project-specific equipment and control configuration.
Engineered options
Start with the application. Add controls and verification in proportion to the risk, duty and project requirements.
CORE
CONTROLLED
MONITORED
Applications
Ozone generation is not a complete treatment process. Each application needs its own preparation, isolation, monitoring and clearance plan.
Controlled odour treatment integrated with the extract system.
Explore commercial kitchens ↗A professional process after source removal and specialist cleaning.
Explore fire & smoke ↗Controlled high-dose treatment for severe, persistent cases.
Explore property odours ↗Equipment routes for valeters, dealers, fleets and specialist cleaners.
Explore vehicle treatment ↗Final polishing stage
Discarb-style cells filled with 207C granular activated carbon can provide a final vapour-phase adsorption stage. Performance depends on the media, bed depth, velocity, humidity, loading and replacement plan.
Technical Centre
Technical submittals, planning support, controls information and issue-managed documents for consultants, contractors and project teams.
Browse technical resources ↗Configuration-specific product and control information.
A project input framework, not a guarantee of approval.
Defined checks, readings and issue control.
Relevant experience
Experience from the wider team spans high-street hospitality and public-sector environments. Named references will only be published after scope, attribution and permissions are confirmed.
Safety first
Ozone is hazardous to health. High-dose space treatment requires unoccupied areas, controlled isolation, timed treatment, ventilation, monitoring and a verified clearance decision before re-entry.
Start with the duty
Share the application, airflow or room size, project stage and operating constraints. We will help define the next step.